of network, including 750 km of national network
1800 km
SOCIETÀ GASDOTTI ITALIA
1800 km
of network, including 750 km of national network
1 billion
Sm3 per year of natural gas
4
active biomethane plants
10
interconnection systems with SRG
235
Active delivery points to industrial, thermoelectric and urban distribution networks
2
storage sites
The SGI infrastructure is a set of high-pressure pipelines with pipes ranging in diameter from 2 to 24 inches. It is interconnected with:
The network consists of a number of major natural gas pipelines that form part of the national grid (RNG), the remainder consisting of natural gas pipelines and regional connections (RRG), and is fully integrated with the Snam Rete Gas network in the national grid system.
Click on the icon
to discover the details of a specific network or area.
From the entry points to the withdrawal points, the gas follows a route that is closely monitored by our physical dispatching system.